• About
  • Profile
  • Education
  • Research

The Effect of Drillhole Spacing and Interpolation Method on GA‐Optimised Dredge Extraction Sequences for HMS Deposits

A case study on the Atlas deposit, Cooljarloo, Western Australia

Geostatistics
Resource Estimation
HMS Deposits
This study shows that uncertainty introduced during resource estimation directly affects extraction sequence optimisation and project economics.
Author

David Spelt

Published

January 1, 2026

Back to top
 

© 2025 Kiarash Pashna. All rights reserved.